After a few days of chaos and uncertainty at the shop, we finally left today for the DB 16 job (DB stands for Derrick Barge, the type of vessel we're on). It’s pretty commonplace for details to shift, and dates to migrate in this business, so the state of craziness in the shop this week was simply another part of the learning curve. Because this job is longer term (60-90 days), and because the tasks we’ll perform could potentially require specialized tools, ours was a heavy load-out (meaning more equipment, more inventory, and more work). In addition to our heavy load-out, another heavy load-out left this morning, with far more specialized tools and equipment (including an 8’ x 6’ ROV sled designed and built specifically for that job, to track pipeline beneath the sea floor). It was a relief to get on the road.
Normally our driver, Kip, delivers us to our jobs. But today, James, our boss and SeaTrepid’s Project/Personnel Manager, drove us to the site. I love Kip, but it was way more fun to have James drive us out. Kip simply gets us from point A to point B, arriving at the appointed hour; when driving with the boss-man, there’s a little wiggle room, time to stop off and run errands, time to have a little Wendy’s salad and a vanilla frosty, time to stop off and buy some FRCs (fire-resistant [retardant?] clothing) that fit a girl.
We arrived in Morgan City (one of LA’s bigger offshore port cities), and came to the J. Ray McDermott… facility? complex? I’m not sure what to call it, because it’s huge. Boats live here, on a river I don’t know the name of, but McDermott also designs and builds very, very large structures, like oil platforms that will eventually be set out somewhere in the Gulf. And you can’t possibly imagine how massive they are.
We came aboard and directed the welders where to cut and what to burn off. On vessels like this one, we have our own little shack on the deck, and our own small crane, or LARS (Launch And Recovery System). The LARS sometimes needs to stick out over the edge of the vessel, which requires the removal, by oxy-acetylene burning, of 6” diameter round steel railing. The shack and the LARS are lifted onto the deck by the on-deck crane, and then welded into place.
I am bunking with 3 other ladies, which makes our number 4, out of approximately 150 people. We have our own little area, with a private bathroom. One of my roommates is Miss Yvonne, who gave me her own little orientation to [a woman’s] life offshore. For as much as I’ve already learned about my job, of diving and platforms, and of offshore existence, I’m glad for the wisdom Miss Yvonne had to share.
11 April 2008
DB16, day 1: Miss Yvonne
Posted by above|below. at 23:00
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment